City of West Greenwich (RI)

Rhode Island Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2017 NATIONAL ELECTRICAL CODE 2021 RHODE ISLAND STATE BUILDING CODE 2021 RHODE ISLAND RESIDENTIAL CODE 2021 RHODE ISLAND FIRE CODE 2021 RHODE ISLAND PLUMBING CODE 2021 RHODE ISLAND MECHANICAL CODE 2021 RHODE ISLAND ENERGY CODE 2021 RHODE ISLAND ADMINISTRATIVE CODE 2021 RHODE ISLAND ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

SE / EE digital stamps on all PV pages 1-7a & PE Letters / Calcs.

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard


Ground Mounts-

Dimensional regulations for ground-mounted solar energy systems.


(1) The maximum height of a ground-mounted solar energy system shall be 12 feet, with the exception of solar-covered parking structures, which shall have a maximum height of 18 feet from the ground. The height shall be measured from the ground level or the base of the system's pedestal to the highest point of the solar energy system, including the top of any support structure or panel. A maximum of six feet of fill shall be permitted, and a dimensional variance shall be required for projects proposing more than six feet of fill.

(2) Setbacks.

(a) A solar energy system that is accessory to a principal structure may be located no closer than 1/2 of the setback that would otherwise apply or 20 feet from the front, side, or rear site lines, whichever is greater.

(b) A limited solar energy system shall have a setback requirement of 200 feet from adjacent residential zoning districts and from the front yard line. Where the subject property borders a nonresidential zoning district, the setback shall be 50 feet.

(3) Lot coverage. A limited solar energy system shall cover no greater than 50% of a lot or contiguous lots in common ownership. The lot coverage calculation shall include inter-row and panel/collector spacing, meaning that the entire area of the installation shall be counted as lot coverage.

Structural & loads

Wind Speed
135
Wind Notes

Exposure Category C. Wind-borne debris region.

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim