Town of Westerly (RI)
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 RHODE ISLAND STATE BUILDING CODE
2021 RHODE ISLAND RESIDENTIAL CODE
2021 RHODE ISLAND FIRE CODE
2021 RHODE ISLAND PLUMBING CODE
2021 RHODE ISLAND MECHANICAL CODE
2021 RHODE ISLAND ENERGY CODE
2021 RHODE ISLAND ADMINISTRATIVE CODE
2021 RHODE ISLAND ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
SE / EE digital stamps on all PV pages 1-7a & PE Letters / Calcs.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 135
- Wind Notes
Exposure Category C. Wind-borne debris region.
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Master Plan Set combining all individual projects into one plan set showing all panels/systems/etc if a project has multi-system job is needed
- Site
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Exact Property line required for ground mounts. Send a permit research task for permitting at CR to get the most accurate property lines.
This has to be scaled properly in our site plan