Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL FUEL GAS CODE 2020 NATIONAL ELECTRICAL CODE 2009 INTERNATIONAL ENERGY CONSERVATION CODE (ENERGY STANDARD ACT)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 94
- Snow Load
- 10
- Reducible Snow Load Allowed
- 1
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
Plan set
- Plan Set Requirements
If any work is being done such as replacing the service, replacing the meter, relocating a panel, replacing a panel, or re-feeding the home, then we need to design with the first means of disconnect outside next to the meter. CCI will not pass inspection with any "service upgrade" work without having the first means of service disconnect outside next to meter. This will require relocated main panels to be outside next to meter or a main breaker enclosure next to meter.
- Label Page Notes
For GROUND MOUNT jobs use 2017 - YELLOW sticker set on prints
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Use 2017 - YELLOW sticker set on prints