Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Town of Fort Mill (SC)

South Carolina Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Code List

2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL FUEL GAS CODE 2020 NATIONAL ELECTRICAL CODE 2009 INTERNATIONAL ENERGY CONSERVATION CODE (ENERGY STANDARD ACT)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Date Plans are Stamped

Fire setbacks

Fire Setback Enforced
1
Setback Notes

* A minimum of (2) 36in pathways required. From lowest edge of roof to ridge * At least one of these pathways should be on the street or driveway side of the roof. * For any plans with modules, a pathway shall be provided on the same plane, an adjacent plane, or straddling the same and adjacent planes.

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
10
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Plan Checklist: Specifications and cut sheets for solar panels and all components including module, inverter, racking and mounts, and other major electrical components. Structural analysis - A structure specific structural analysis must be submitted by a SC licensed engineer with an evaluation of the structural components for the additional loads and rooftop-mounted photovoltaic systems need to resist components and cladding wind loads. The ICC specifies that a single unit must be used to establish the effective wind area. Must comply with the International Fire Code sections for Fire Department access for venting. o 2015 IRC R324.3 Photovoltaic systems. Photovoltaic systems shall be designed and installed in accordance with Sections R324.3.1 through R324.7.2.5 and NFPA 70. Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use inverters listed for utility interaction. ï‚§ R324.3.1 Equipment listings. Photovoltaic panels and modules shall be listed and labeled in accordance with UL 1703. ï‚§ R324.4 Rooftop-mounted photovoltaic systems. Rooftop mounted photovoltaic panel systems installed on or above the roof covering shall be designed and installed in accordance with Section R907. ï‚§ R324.4.1 Roof live load. Roof structures that provide support for photovoltaic panel systems shall be designed for applicable roof live load. The design of roof structures need not include roof live load in the areas covered by photovoltaic panel systems. Portions of roof structures not covered by photovoltaic panels shall be designed for roof live load. Roof structures that provide support for photovoltaic panel systems shall be designed for live load, LR, for the load case where the photovoltaic panel system is not present. o IRC SECTION R907 - ROOFTOP-MOUNTED PHOTOVOLTAIC SYSTEMS ï‚§ R907.1 Rooftop-mounted photovoltaic systems. Rooftop mounted photovoltaic panels or modules shall be installed in accordance with this section, Section R324 and NFPA 70. ï‚§ R907.2 Wind resistance. Rooftop-mounted photovoltaic panel or modules systems shall be installed to resist the component and cladding loads specified in Table R301.2(2), adjusted for height and exposure in accordance with Table R301.2(3). ï‚§ R907.3 Fire classification. Rooftop-mounted photovoltaic panels or modules shall have the same fire classification as the roof assembly required in Section R902. ï‚§ R907.4 Installation. Rooftop-mounted photovoltaic panels or modules shall be installed in accordance with the manufacturer's instructions. ï‚§ R907.5 Photovoltaic panels and modules. Rooftop-mounted photovoltaic panels and modules shall be listed and labeled in accordance with UL 1703 and shall be installed in accordance with the manufacturer's printed instructions:

Site

Site Plan for Ground Mounted Systems • Site Plan showing the arrangement of the panels on the ground, north arrow, property lines and dimensions and distance from property lines, street name and location, existing home location with front and rear labeled. The Fort Mill Zoning Ordinance may have specific design standards for the installation of solar panels. Please see the sections below. Article 4-400 (18) Ground-Mounted Solar Installations In instances where roof-mounting of solar panels or solar thermal collectors is not practicable due to efficiency or aesthetic considerations, ground-mounting may be necessary. Due to differences in scale between residential and commercial/institutional/industrial solar systems, separate standards apply as follows: (a) Residential 1. Must be located to the rear of the principal structure and screened from view from public streets. 2. Must be as close to the ground as practicable and in no case higher than the principal structure. 3. The mounting framework must be neutral in color or screened from view from surrounding residential properties. (b) Commercial/Institutional/Industrial 1. Every effort must be made to completely screen the devices from view from public streets. In instances where complete screening is not possible, the devices must be screened and/or located as to have a minimal visual impact as seen from public streets. 2. Must be as close to the ground as practicable and in no case higher than the principal structure. 3. The mounting framework must be neutral in color or screened from view from public streets. Allowable yard encroachments - Installations that are six (6) feet or less in height shall not project more than two (2) feet into a required yard, based on the required yards for accessory structures. Installations taller than six (6) feet may not encroach into required yards unless approved as a variance by the Zoning Board of Appeals.

Roof Plan

Building Elevation Drawings for Roof Mounted Systems: • Provide an overhead elevation drawing or site plan drawing of the building showing the location of the panels on the roof with the street shown for reference and property lines. Include North arrow. Include the location of any utility lines. The Fort Mill Zoning Ordinance may have specific design standards for the installation of solar panels. Please see the sections below. Article 6-800 (B) Residential Design Standards - Any solar installation must be located on the rear elevation or otherwise configured to the degree practicable to have a minimal visual impact as seen from the street. Solar installations that are visible from the street must either be composed of building-integrated components (such as solar shingles) that are not readily evident, or be designed and mounted to match the shape, proportions, and slope of the roof.

Electrical Diagram

Electrical Plan: • Power riser diagram and panel schedules. Show location and size of electrical service, meter, disconnects, panels, transformer, etc. in accordance with NEC Article 690.5. The diagram must show the meter base separate from the panel. The meter should be shown schematically as self-contained with the service passing through meter. The PV connection cannot be made inside the utility meter base. Inverters should be equipped with integrated ARC-fault and rapid shutdown per NEC 690.5. o Add the following notes on the plans: o Add note, “A lockable disconnect shall be located within 6’ of the utility meter on an exterior wall and accessible to utility personnel at all times.” o Power riser must state “In the event of a Utility power outage the PV system will automatically disconnect from the utility.” Maximum Voltage per NEC 690.7 (A-E) and circuit sizing NEC 690.8. • Bidirectional meter will not be installed until all necessary Net metering Documentation has been submitted and approved by the Electrical Engineering Department. • List the specific UL and IEEE certifications (UL 1741 & IEEE 1547) that apply for systems interconnecting with an electric utility provider on the one-line diagram.

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Fort Mill (SC) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.