Town of Hampton (SC) (CCI)

South Carolina Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL FUEL GAS CODE 2020 NATIONAL ELECTRICAL CODE 2009 INTERNATIONAL ENERGY CONSERVATION CODE (ENERGY STANDARD ACT)

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

2018 Setbacks

Structural & loads

Wind Speed
94
Snow Load
10
Reducible Snow Load Allowed
1
Structural Notes

Per AHJ, stamped plans must be flattened for AHJ to be able to view the stamps in their online portal

Minimum Ground On Roof
#10

Electrical

Allowed POI
Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Plan set

Plan Set Requirements

If any work is being done such as replacing the service, replacing the meter, relocating a panel, replacing a panel, or re-feeding the home, then we need to design with the first means of disconnect outside next to the meter. CCI will not pass inspection with any "service upgrade" work without having the first means of service disconnect outside next to meter. This will require relocated main panels to be outside next to meter or a main breaker enclosure next to meter. 

Label Page Notes

For GROUND MOUNT jobs use 2017 - YELLOW sticker set on prints

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

Use 2017 - YELLOW sticker set on prints

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Hampton (SC) (CCI) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.