City of Arlington (TX)

Texas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL FIRE CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL FUEL GAS CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2020 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

The electrical line diagram must have

1) a Master Electricians printed name, date, signature and Master license number; or

2) be stamped, signed and dated by a licensed Engineer in the state of Texas.

  • The engineer seal that is on the electrical line diagram states it is for "Structural Attachments to Roof Only".
  • That statement must be removed, or a seal that applies to electrical must be added. (Please see attachment in files section, example included!)
Stamp Location On Plans
Unspecified
Date On Stamps
Date Plans are Stamped

Fire setbacks

Fire Setback Enforced
1
Setback Notes
  • Existing system must be shown accurately on the roof and included in the roof area (33%) calculations.
  • Provide the total roof area and array area calculations.
  • If there is an existing system, provide calculations for new and existing combined.
  • Unpermitted structures may NOT be included in roof area calculations.
  • For photovoltaic arrays occupying more than 33 percent of the plan view total roof area, a setback of not less than 36 inches wide is required on both sides of a horizontal ridge. This requirement applies to both new and previously installed array.

Structural & loads

Wind Speed
100
Wind Notes

Exposure Category B

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • Preferred battery install - outside.
  • If batteries are designed inside the garage, per code, we are required to add heat detectors inside the garage, and smoke detectors (interconnected) inside the house. Bollards are required in front of the batteries if they are installed in the garage.
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements


Cover Page
  • Electrical contractor license # & master electrician license numbers required on title block of plans.
Roof Plan


Attachment Detail


Electrical Diagram

LST:

  • When calling out a line side tap one of the two following builds should be designed, based on the as-built conditions.
  • All projects must comply with emergency disconnect NEC: 230.85). Show Tap in MBE
Electrical Diagram Notes

LST [LINE SIDE TAP TERMINATION IN ACCORDANCE WITH NEC 230.46 WITH TAP CONNECTOR POLARIS IT-350]

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Arlington (TX) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.