City of Beverly Hills (TX)
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
- 2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL PLUMBING CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL EXISTING BUILDING CODE 2018 INTERNATIONAL PROPERTY MAINTENANCE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL ENERGY CONSERVATION 2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Any SolarAPP+ Restrictions
- 0
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
- Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- * 7/12/21 - Per conversation with City Clerk Shareen, they operate under City of Waco design guidelines - I tried my best to pull all the information from that database and copied it to this one - Alia * Copied from City of Waco Database - "PE stamps; SE digital stamps on corresponding PV pages & PE Letter / Calcs. Combined plans, letters / calcs into one PDF file"
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- City Clerk stated they they operate under the same design requirements as the City of Waco
- Electrical Diagram
- **Copied from City of Waco:** Surge protectors required on SLD similar to Austin Energy Indicate the (SIZE AND TYPE) service entrance conductors for all projects ### Example - 200A Main service breaker requires (3) - #3/0 AWG THWN-2 ### Example - 100A Main service breaker requires (3) - #3 AWG THWN-2 ### Example - 125A Main service breaker requires (3) - #3 AWG THWN-2 For MPU, add note: "Existing loads will be relocated into the new main service panel" Meter/Main Combo is not allowed
- Electrical Diagram Notes
- Installation shall be by properly qualified TDLR license holder. Electrical Equipment shall be listed, labeled and installed for its intended use Installation shall be to the NEC 2020 • Maintain working space about electrical equipment 110.26 Grounding must meet 250.160-166, 250.64(C) and 250.64, 250.66 Electrical work that penetrates to the interior shell of a dwelling may require smoke detectors.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim