City of Carrollton (TX)

Texas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2024 INTERNATIONAL BUILDING CODE

2024 INTERNATIONAL RESIDENTIAL CODE

2024 INTERNATIONAL MECHANICAL CODE

2024 INTERNATIONAL PLUMBING CODE

2024 UNIFORM PLUMBING CODE

2024 INTERNATIONAL FUEL GAS CODE

2024 INTERNATIONAL ENERGY CONSERVATION CODE

2024 INTERNATIONAL EXISTING BUILDING CODE

2024 INTERNATIONAL SWIMMING POOL AND SPA CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Fire setbacks can be shown to be on either side of valleys and hips or divided onto both. Additionally, any layout change requires resubmitted plans to the AHJ, especially if they will change our fire setback locations. For photovoltaic arrays occupying not more than 33 percent of the plan view total roof area, not less than an 18โ€ clear setback is required on both sides of a horizontal ridge.

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

* **_Both the PE letter and the PE calcs must reference Section 324 of the 2021 IRC only, not the IBC or IEBC_** * SE digital stamps on corresponding PV pages & PE Letter / Calcs.

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Service Ground Requirements

AHJ is requiring surge protection at new panel also need to add secondary ground rod & inter-system bonding connection every time we add an MBE or MPU

Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Per City ordinance, Solar can only be installed on single family dwellings & detached garages. We cannot install on patio covers, shade structures, carports or similar structures.

All J-boxes need to be shown on the plans.

EXISTING SYSTEMS

add the complete make and model of the existing equipment in both the site plan and the one-line diagram

Site Notes

Must bond gas lines to ground bar in MSP

Roof Plan


Attachment Detail

Solar can only be installed on single family dwellings & detached garages. We cannot install on patio covers, shade structures, carports or similar structures

Attachment Detail Notes
  • Per 2021 IRC Section R324.4.1 A Texas Registered Engineers letter is required to be on file stating the rooftop mounted photovoltaic panel system meets all requirements of the 2021 IRC Section 324.
  • Per 2021 IRC Section R324.3.1 Mounting systems need to be listed and labeled in accordance with UL 2703
Electrical Diagram

AHJ enforces 2020 NEC 230.85 emergency disconnecting means.

Taps need to be UL listed and SR rated for lineside (UL documentation required)

Electrical Diagram Notes

AHJ is requiring surge protection at new panel also need to add secondary ground rod & inter-system bonding connection every time we add an MBE or MPU

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim