City of Fort Worth (TX)

Texas Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE WITH LOCAL AMENDMENTS

2021 INTERNATIONAL MECHANICAL CODE WITH LOCAL AMENDMENTS

2021 INTERNATIONAL RESIDENTIAL CODE WITH LOCAL AMENDMENTS

2021 INTERNATIONAL ENERGY CODE WITH LOCAL AMENDMENTS

2021 INTERNATIONAL PLUMBING CODE WITH LOCAL AMENDMENTS

2021 INTERNATIONAL FUEL GAS CODE ADOPTION AND AMENDMENTS

2021 INTERNATIONAL EXISTING BUILDING CODE WITH LOCAL AMENDMENTS

2021 INTERNATIONAL FIRE CODE WITH LOCAL AMENDMENT

2021 INTERNATIONAL SWIMMING POOL AND SPA CODE

2015 INTERNATIONAL ENERGY CONSERVATION CODE FORT WORTH ADMINISTRATIVE

BUILDING CODE

2023 NATIONAL ELECTRICAL CODE AND AMENDMENTS

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
Other (See Submission Notes)
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes

EE Stamp required on ELD

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

2018 Setbacks with special considerations below:


Fire Pathways:

  • Residential hip roof layouts: Each mounting plane greater than a 9.5° pitch (2:12) with PV modules installed needs a 3' pathway from eave to ridge. The pathway needs to be on a structurally strong part of the roof capable of supporting the live load of fire fighters.
  • Roof access points shall be located in areas that do not require the placement of ground ladders over openings such as windows or doors and are clear of all overhead hazards.

Fire Setbacks

  • Residential gable roof layouts: Each mounting plane greater than a 9.5° pitch (2:12) with PV modules installed needs two 3' pathways from eave to ridge.
  • Residential hip roof layout (with valleys): Each mounting plane greater than a 9.5° pitch (2:12) with PV modules installed needs 18" setbacks on both sides of the hips and valleys where an adjacent mounting plane also has modules. If there are no panels on the adjacent MP (over the hip or valley), the 18" setback does not apply.
  • These requirements do not apply to habitable structures with a pitch under 9.5° (2:12), or uninhabitable structures.

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
5
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

AHJ requests the following codes be present on the PE letter: 2015 IEC, 2023 NEC, 2021 IRC, 2021 IBC

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Preferred battery install outside.

  • If batteries are designed inside the garage, per code, we are required to add heat detectors inside the garage, and smoke detectors (interconnected) inside the house.
  • Bollards are required in front of the batteries if they are installed in the garage.
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

Preferred Tie Ins:

  1. Breaker tie ins (with Derates, if needed)
  2. Line Side Taps (Approved Taps: B-TAPS & POLARIS IT-350)
  3. Meter Lug Kits inside Utility Meter Can (This is only approved if the utility is not Oncor - Oncor does not allow us to tie into their meter can)

Emergency "Fireman's" Disconnects required (this includes Main Breaker Enclosures & AC Discos) at the Utility Meter outside if tie in is LST and the main breaker is NOT outside. We can perform the LST in (N) Disconnect. If MBE is needed, LST will need to be shown inside the MBE.

For one- and two-family dwelling units, all service conductors shall terminate in disconnecting means having a short-circuit current rating equal to than the available fault current, installed in a readily accessible outdoor location.

Include all subsequent parts in BOM. Meter can AND disconnect located outside (readily accessible).

Include the confirmation letter in the files section.

Electrical Diagram Notes

Tesla ESS - Add the following note

  • ESS is Listed to UL916 to utilize "Source-side" EMS per 750.30 in accordance with 750.30 (C)(1) - (C)(4) and Labeling in Accordance with 750.50. 


Label Page

*ALL ESS*

  • Ensure proper ESS Labels are present
  • Ensure Placard is clearly labeled
Label Page Notes


Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Setback Front Yard
25
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Fort Worth (TX) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.