City of Kendleton (TX)
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
- 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL PLUMBING CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
- Site Plan with total number of modules located on rooftop showing roof access, pathways and spacing requirements Mounting structure, anchors and roof penetration Location of equipment (inverters, disconnects, j-boxes) One (1) Line Electrical diagram Grounding Points Conductor size and type Conductor insulation type Over current protection Inverter size and type Disconnect size and type All warning marking and labeling Method being used for rapid shutdown
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
- Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Wind Speed ordinance of 110 mph 3 second Wind Gust
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Structural plans designed and sealed by Professional Engineer for securing panels to existing structures and that the structure is capable of supporting new loads and is compliant with Missouri City Wind Speed ordinance of 110 mph 3 second Wind Gust. โ Complete electrical plans prepared by a Professional Engineer or Licensed Master Electrician.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
Centerfed 120%: EE Stamp Required Required electrical load analysis.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim