City of League City (TX)
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 TEXAS STATE BOARD OF PLUMBING EXAMINERS LAW/ RULES
2021 INTERNATIONAL ENERGY CODE
2021 INTERNATIONAL PROPERTY MAINTENANCE CODE
2023 NATIONAL ELECTRICAL CODE
2021 INTERNATIONAL FIRE CODE
LEAGUE CITY CODE OF ORDINANCES NATIONAL FIRE CODE
NFPA LIFE SAFETY CODE 2021 EDITION
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Date Plans are Stamped
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 145
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Cover Page
The wind load design criteria shall be on the plans
- Electrical Diagram
MPU
- PROVIDE SURGE PROTECTOR
- PROVIDE TWO GROUND RODS
- Custom Placards Required
- 0
- Placards Notes
- TNMP/ Centerpoint Energy - if disco is 10' or more from meter placard is required - PT
Ground mount
- Ground Mount Fencing Required
- No