City of Seabrook (TX)
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE WITH AMENDMENTS
2021 INTERNATIONAL RESIDENTIAL CODE WITH AMENDMENTS
2021 INTERNATIONAL PLUMBING CODE WITH AMENDMENTS
2021 INTERNATIONAL MECHANICAL CODE WITH AMENDMENTS
2021 INTERNATIONAL GAS CODE WITH AMENDMENTS
2021 INTERNATIONAL ENERGY CODE WITH AMENDMENTS
2021 PROPERTY MAINTENANCE CODE WITH AMENDMENTS
2021 INTERNATIONAL FIRE CODE WITH AMENDMENTS
2021 NFPA 101 LIFE SAFETY CODE
2020 NATIONAL ELECTRICAL CODE WITH AMENDMENTS
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 150
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Provide engineer sealed equipment mounting information/calculations, and to meet the City’s adopted win speed of 150 Mph. (Ultimate) Min. SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 150mph. Exposure Category C.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
Standard
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim