City of South Jordan (UT)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL ENERGY CONSERVATION CODE 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL FUEL GAS CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
Battery systems require a dedicated AC Disconnect located within 10 ft of the UM. Battery Disconnect must bear this engraved label: BATTERY DISCONNECT . No published information about battery placement.
Bollards required when battery is in garage
- Separate ESS Disconnect Required
- Local Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Spec sheets must include highlighted correlating equipment wind speed - snow load This AHJ requires as-builts to be submitted post install regardless if there were changes or not. If there are changes, we will call install hotline while on site. Please expedite any as-builts so we can submit asap. Photos of electrical panel and attic space required
- Site
Show roof access point Provide a Site plan drawn to scale. **Plans shall show roof access, equipment locations, type and size of connections, size and type of conductors, disconnects, array wiring, and equipment grounding.**
- Site Notes
All Jobs [All equipment UL listed & installed to manufacture's specifications]
- Electrical Diagram
Provide a picture of the service panel with the location of the Backfed breaker. "If grounding wire is smaller than #6 solid copper it shall be protected in conduit even if installed under array - NEC 250.120(C)" “Rapid Shutdown” of the PV system is required (NEC 690.12) for any PV systems installed on a building except for a system that incorporates micro-inverters. Provide manufacturer's specification sheets and installation instructions showing how rapid shutdown is to be provided and installed." FOR BATTERIES: * Show how batteries will be properly ventilated, and how they will be protected depending on their location
- Label Page
Need a picture of the MSP in plans
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Yes