City of Kirkland (WA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2023 NATIONAL ELECTRICAL CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 98
- Wind Notes
https://ascehazardtool.org/
- Snow Load
- 20
- Snow Load Notes
https://ascehazardtool.org/
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard ESS Requirements
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Please print the planset in Black and White. The colors red, green, orange, and blue are reserved for jurisdiction use for review and approval of plans.
For all Trenches
- 2 Disconnects required - one at each end of trench
- Required for AC or DC trenches
- Cover Page
Standard
- Site
Standard
- Roof Plan
Standard
- Attachment Detail
Standard
- Electrical Diagram
For all Line Side Connections:
- Neutral and ground bonded in fused disconnect
- #6 bare copper run from N/G bar to (E) MSP's GEC and crimped
- Schedule 80 PVC must be used in between fused disconnect and MSP - only showing 2 hots and neutral
- All other conduit can be EMT
For all Load Side Taps:
- Schedule 80 PVC must be used in between disconnect and MSP
- Electrical Diagram Notes
Add note - [Maximum inverter OCPD may be no greater than 120% of the panelboard bus rating minus the panelboard main OCPD rating in accordance with NEC 705.12(D)(2)(3)(b). Acceptable]
- Label Page
Standard
WARNING: POWER SOURCE OUTPUT CONNECTION - DO NOT RELOCATE THIS OVERCURRENT DEVICE.
- Label Page Notes
The warning sign(s) or label(s) shall comply with 110.21(B).
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
AHJ advised that we are unable to install past the plane of the home in the front of the property and cannot be more than 6ft tall
- Setback Back Yard
- 5
- Setback Side Yard
- 5