City of Port Orchard (WA)
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Structural & loads
- Wind Speed
- 110
- Reducible Snow Load Allowed
- 1
Electrical
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Supply Tap Neutral Ground Bond Required
- 1
Plan set
- Electrical Diagram
For all Line Side Connections:
- Neutral and ground bonded in fused disconnect
- #6 bare copper run from N/G bar to (E) MSP's GEC and crimped
- Schedule 80 PVC must be used in between fused disconnect and MSP - only showing 2 hots and neutral
- All other conduit can be EMT
For all Load Side Taps:
- Schedule 80 PVC must be used in between disconnect and MSP
- Non Standard Revision Requirements
Manufactured Homes require 2021 code years and 2023 NEC. We also need to send to staff for Structural Stamps and calcs for 2x2 framing.