Town of Arpin (WI)
Spot something wrong?
These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.
Report a correction NEC Code Version2017
Fire Setback EnforcedNo
Codes
- NEC Code Version
- 2017
- Code List
- Wisconsin UDC 316 Electric Code Wisconsin UDC 371 Solar Code 2017 National Electric Code
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- No
- New Planset Required For Module Swap
- No
Fire setbacks
- Fire Setback Enforced
- No
- Setback Notes
- Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 35
- Reducible Snow Load Allowed
- Yes
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- No
- ESS Notes
- Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim