Clarksville Connected Utilities

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

If the kWH’s generated by the net metering facility and fed back to the electric utility exceeds the kWH’s supplied by the electric utility to the net metering customer during the applicable billing period, the customer shall NOT receive any compensation from the utility for such net metering excess delivered kWH’s during the billing period, but shall be credited with any excess net accumulation at the end of the calendar year, will be credited back at the electric utilities average cost per kWH of purchased power the previous fiscal year (fiscal year October 1 to September 30th). Any amount in excess of that shall expire at the end of the calendar year.

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
70
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(479) 754-3148

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
6193634
Express Planset Eligible
No