Conway Corp

Arkansas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
Post Solar Billing Method
Export Rate
Solar Export Type
Other
Net Excess Generation Notes

When the kilowatt hours generated by the Net-Metering Facility and fed back to the Electric Utility exceed the kilowatt hours supplied by the Electric Utility to the net metering customer during the Billing Period, the customer shall not receive any compensation from the Electric Utility for such Net Excess Generation during the Billing Period but shall be credited with the accumulated Net Excess Generation, if any, in the next Billing Period. Any accumulated Net Excess Generation remaining at the end of a calendar year, shall not expire and shall be carried forward to subsequent Billing Periods indefinitely. A net-metering customer may elect to have the Electric Utility purchase Net

Excess Generation credits older than twenty-four (24) months in the customer's

account at the Electric Utility's estimated Annual Average Avoided Cost for wholesale energy if the sum to be paid to the net-metering customer is at least one

hundred dollars ($100).

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Conway Corp before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.