Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Craighead Electric Cooperative Corporation

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

If you happen to produce more than you use for the month, any remainder is carried over and applied to your next month’s bill. The excess generation will continue to accumulate until the credit is utilized or after $100 or more has accumulated in a 24 month period at the avoided cost rate.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

25 kW AC / 100% offset

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Install Reqs

24/7 accessible, lockable disconnect.


Member must provide the meter socket for the Cooperative’s meter and any related interconnection equipment 

Rate Schedule Link
link
Website
link

Other details

Restrict Inspection
0
Revision Required
1
Address ID
978167
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Craighead Electric Cooperative Corporation before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.