Craighead Electric Cooperative Corporation

Arkansas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

If you happen to produce more than you use for the month, any remainder is carried over and applied to your next month’s bill. The excess generation will continue to accumulate until the credit is utilized or after $100 or more has accumulated in a 24 month period at the avoided cost rate.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

25 kW AC / 100% offset

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Install Reqs

24/7 accessible, lockable disconnect.


Member must provide the meter socket for the Cooperative’s meter and any related interconnection equipment 

Rate Schedule Link
link
Website
link

Other details

Revision Required
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Craighead Electric Cooperative Corporation before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.