Liberty Utilities (AR)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0271
- Net Excess Generation Notes
If the kWhs generated by the Net-Metering Facility and fed back to the Electric Utility during the Billing Period exceed the kWhs supplied by the Electric Utility to the Net- Metering Customer during the applicable Billing Period, the Electric Utility shall credit the Net-Metering Customer with any accumulated Net Excess Generation in the next applicable Billing Period. For Net Excess Generation credits older than twenty-four (24) months, a Net Metering Customer may elect to have the Electric Utility purchase the Net Excess Generation credits in the Net-Metering Customer’s account at the Electric Utility’s Avoided Cost plus any additional sum determined under the Net Metering Rules, if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100).
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Disconnect must have 24/7 access - no exceptions.
- If dogs are in the yard, the disconnect must be outside the fence - no exceptions.
- If the meter is in a locked fence, move the disconnect outside or provide a combo lock and code - no exceptions.
- Install Reqs
- Liberty Utilities do not allow piercing type connectors to interconnect. Must use the lug type (ex…Polaris or Burndy) connectors.
- Placards
- Placards must be black with white lettering and mounted with screws or rivets only.
- No glue, tape, or red/white placards.
- Systems won’t be commissioned without all required placards.
- Do not place placards on the meter base or utility side of meter panels.
- PV disconnect placards must be 6" x 3".
- Location placards must be 8" x 5" when the disconnect is over 10' from the meter.
- Location placards required when the battery system is over 10' from the meter.
- Location placards required when the meter is around a corner or out of sight.
- Location placards required for pole-mounted meters.
- Pole-mounted meters need a location placard if the disconnect is on the side or back of the pole.
- Battery systems need an 8" x 5" placard at the meter.
- Remote battery systems must include location info on the placard.
Placard requirements uploaded in file section
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (417) 625-5181
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 1492431
- Express Planset Eligible
- Yes