OG&E - Oklahoma Gas & Electric (AR)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- Yes
- Post Solar Billing Method
- Export Rate
- Net Excess Generation Notes
If the kWhs generated by the Net-Metering Facility and fed back to the Electric Utility during the Billing Period exceed the kWhs supplied by the Electric Utility to the Net-Metering Customer during the applicable Billing Period, the Electric Utility shall credit the Net-Metering Customer with any accumulated Net Excess Generation in the next applicable Billing Period. The Net Excess Generation credits remaining in a Net-Metering Customer’s account at the close of a billing cycle shall not expire and shall be carried forward to subsequent billing cycles indefinitely. For Net Excess Generation credits older than twenty-four (24) months, a Net-Metering Customer may elect to have the Electric Utility purchase the Net Excess Generation credits in the Net-Metering Customer’s account at the Electric Utility’s Avoided Cost plus any additional sum determined under the Net Metering Rules, if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100).
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 100% offset or 25 kW (whichever is less)
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
Plans & docs
- SLD Reqs
The disconnect must also be installed between 48” and 66” from ground level and shall be capable of being padlocked open by OG&E personnel during emergencies and/or for equipment maintenance.
Customer shall provide and install a meter socket for the Electric Utility's meter
- Placards
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
Other details
- Revision Required
- Yes