OG&E - Oklahoma Gas & Electric (AR)

Arkansas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
Yes
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

If the kWhs generated by the Net-Metering Facility and fed back to the Electric Utility during the Billing Period exceed the kWhs supplied by the Electric Utility to the Net-Metering Customer during the applicable Billing Period, the Electric Utility shall credit the Net-Metering Customer with any accumulated Net Excess Generation in the next applicable Billing Period. The Net Excess Generation credits remaining in a Net-Metering Customer’s account at the close of a billing cycle shall not expire and shall be carried forward to subsequent billing cycles indefinitely. For Net Excess Generation credits older than twenty-four (24) months, a Net-Metering Customer may elect to have the Electric Utility purchase the Net Excess Generation credits in the Net-Metering Customer’s account at the Electric Utility’s Avoided Cost plus any additional sum determined under the Net Metering Rules, if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100).

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 100% offset or 25 kW (whichever is less)

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes

Plans & docs

SLD Reqs

The disconnect must also be installed between 48” and 66” from ground level and shall be capable of being padlocked open by OG&E personnel during emergencies and/or for equipment maintenance.


Customer shall provide and install a meter socket for the Electric Utility's meter

Placards


Equipment Approvals
California Energy Commission
Rate Schedule Link
link
Website
link

Other details

Revision Required
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with OG&E - Oklahoma Gas & Electric (AR) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.