Osceola Municipal Light & Power
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Other
- Solar Export Value Notes
- 0.00
- Net Excess Generation Notes
Net Metering: If the kWhs generated by the net-metering facility and fed back to OMLP exceed the kWhs supplied by OMLP to the net-metering customer during the applicable billing period, OMLP shall credit the net-metering customer with any accumulated net excess
generation in the next applicable billing period, month-to-month, until the close of the annual billing cycle, at which time any net excess generation credit shall expire and shall zero out.
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
MAXIMUM SYSTEM SIZE: 10 kW DC or AC or 100% offset (whichever is less)
No Exception - Anything above 10 kW is not eligible for Net Metering
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Utility requires STRUCTURAL engineering signed by a Licensed Professional Engineer
- SLD Reqs
- Utility requires all panels to be minimum 200A service. Future projects will need a 200A min service/upgrade prior to PV installation
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Rate Schedule Link
- link
- Website
- link
- Phone
- (870) 563-5245
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes