Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

SWEPCO - Southwestern Electric Power Co. (AR)

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Export Rate
Net Excess Generation Notes

If the kWhs supplied by the Electric Utility exceeds the kWhs generated by the Net-Metering Facility and fed back to the Electric Utility during the Billing Period, the Net-Metering Customer shall be billed for the net billable kWhs supplied by the Electric Utility in accordance with the rates and charges under the Net-Metering Customer’s standard rate schedule.

Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

25 kW Max

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

SLD Reqs

AC Disconnect Required

Website
link

Other details

Restrict Inspection
1
Address ID
945887
Express Planset Eligible
Yes