DVEC - Duncan Valley Electric Cooperative
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Layout must show a visual AC Disconnect
- SLD Reqs
- One Line and Three Line Diagram required.
GTE BATTERY
- Per the AZ Branch Production Manager, we install the AWG 8 (Wire Size (4) on the Conduit Schedule) for ALL battery systems.
- Please make sure the Wire size from DER storage disco to DER storage mtr shows (4)AWG 8.
- Electric Service Reqs
- Install Reqs
The utility will provide and install the DG Meter/ PV Meter at the time of utility inspection.
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- 928-359-2503
Other details
- Restrict Inspection
- 0
- Address ID
- 108077
- Express Planset Eligible
- Yes