Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

ED2 - Electrical District No.2

Arizona Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Include the street address, arrangement of the major equipment, including the electrical service entrance section and ED2 meter, location of generator and interface equipment, and the location of the disconnect switch.

SLD Reqs

For Existing System:

  • If there's an existing PV system, both new and existing system will need to pass through the same production meter.
  • PV plans need to show the complete system
Electric Service Reqs

System size - sister company with Hohokam


The Cap size limit for PV is 10kW DC regardless of customer annual usage.

Meter Num Req SLD 3LD
1
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(520) 723-7741

Other details

Restrict Inspection
0
Address ID
108057
Express Planset Eligible
No