Hohokam Irrigation and Power
Net metering & export
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.04
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- Allowed Meter Adapter
- Tesla Backup Switch
Plans & docs
- Site Plan Reqs
Include the street address, arrangement of the major equipment, including the electrical service entrance section and ED2 meter, location of generator and interface equipment, and the location of the disconnect switch.
- SLD Reqs
Add a Visible, Lockable, Labeled Disconnect Between Main Service Panel/UM and Microgrid Interconnect Device (MID). MID is usually, Gateway, Backup Interface or IQ System Controller.
GTE BATTERY
EFFECTIVE 02/27/20: Utility will reject the plans if wire size does not match what is installed in the field. Per the AZ Branch Production Manager, we install the AWG 8 (Wire Size (4) on the Conduit Schedule) for ALL battery systems.
Please make sure the Wire size from DER storage disco to DER storage mtr shows (4)AWG 8.
EATON B-LINE 011 METER SOCKET 125A 4 JAW 1PH NEMA 3R TOP FEED
- Electric Service Reqs
System size ;
The Cap size limit for PV is 10kW DC regardless of customer annual usage.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (520) 723-7751
Other details
- Restrict Inspection
- 0
- Address ID
- 108056
- Express Planset Eligible
- No