SCIP - San Carlos Irrigation Project
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- NEM Type
- N/A
- TOU Utility
- No
- Post Solar Billing Method
- Non-export
- Solar Export Type
- N/A
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Tap Criteria
Line side taps are not allowed in this Utility.
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
System size:
10 kW DC The limit applies for all projects (PV-only and PV+battery)
Metering & disconnect
- Production Meter Required
- No
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- SLD Reqs
- Utility meter labeling to show as (SCIP Utility Meter)
GTE BATTERY
- Utility will reject the plans if wire size does not match what is installed in the field.
- Please make sure the Wire size from DER storage disco to DER storage mtr shows (4) AWG 8.
- Placards
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (520) 723-6253
Other details
- Mod Swap Requires Planset
- Yes