SCIP - San Carlos Irrigation Project

Arizona Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
TOU Utility
No
Post Solar Billing Method
Non-export
Solar Export Type
N/A
Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Tap Criteria

Line side taps are not allowed in this Utility.

Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

System size:

10 kW DC The limit applies for all projects (PV-only and PV+battery)

Metering & disconnect

Production Meter Required
No
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs


SLD Reqs
  • Utility meter labeling to show as (SCIP Utility Meter)

GTE BATTERY


  • Utility will reject the plans if wire size does not match what is installed in the field.
  • Please make sure the Wire size from DER storage disco to DER storage mtr shows (4) AWG 8.
Placards


Equipment Approvals
California Energy Commission
Website
link
Phone
(520) 723-6253

Other details

Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with SCIP - San Carlos Irrigation Project before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.