Town of Thatcher Utility
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
DG Owner/Operator agrees that installation shall not exceed 125% of the customer’s total connected load at the site where the Distributed Generation is located.
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Include location of meters, electrical panels, and disconnect switches in addition to generation system components
Show location of fences, gates, or any restrictions to access by Thatcher personnel
- SLD Reqs
PV Meter Required? Per Rachel at the Town of Thatcher, a production meter is not required.
Design must contain an appropriate Disconnect Switch with lock out capability and appropriate circuit protection equipment
Disconnect Switch and Generator meter shall be located near the service entrance and Thatcher bi-directional utility meter
- Website
- link
- Phone
- (928) 428-2290
Other details
- Restrict Inspection
- 0
- Address ID
- 143992
- Express Planset Eligible
- Yes