Town of Wickenburg

Arizona Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The customer will recieve a monthly bill for the base charge and any usage over that of generation. In the event no usage is required there will not be a kwh charge. The Town of Wickenburg does NOT pay the customer for excess power returned to the grid.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Follows APS requirements

SLD Reqs

Follows APS requirements

Install Reqs

All transfer switches utilized to serve an electrical load from either the Town of Wickenburg's Electric Grid or an alternate power generation or storage source

shall prevent both sources from being paralleled or simultaneously interconnected. Transfer switches for this application shall be "break-before-make" transfer scheme using open transition style transfer switches.

Equipment Approvals
California Energy Commission
Website
link
Phone
(928) 684-5451