Town of Wickenburg
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The customer will recieve a monthly bill for the base charge and any usage over that of generation. In the event no usage is required there will not be a kwh charge. The Town of Wickenburg does NOT pay the customer for excess power returned to the grid.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
TDR Process: Notify the Town at least 48 hours.
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Follows APS requirements
- SLD Reqs
Follows APS requirements
- Install Reqs
All transfer switches utilized to serve an electrical load from either the Town of Wickenburg's Electric Grid or an alternate power generation or storage source
shall prevent both sources from being paralleled or simultaneously interconnected. Transfer switches for this application shall be "break-before-make" transfer scheme using open transition style transfer switches.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (928) 684-5451
Other details
- Restrict Inspection
- 0
- Address ID
- 677220
- Express Planset Eligible
- Yes