CA - GWP - City of Glendale Water and Power
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- CEC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 110
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- GWP uses 110% of the customer's kWh usage of the past 12 months to establish the customer's anticipated annual load
- PV systems ≤ 10 kW CEC-AC are exempt from the 110% historical usage cap.
- Systems may include up to 30 kWh of battery storage.
- System Offset Notes
- Offset Calc Tool
- CSI
Metering & disconnect
- Production Meter Required
- Situational
- Production Meter Criteria
- PRODUCTION METER REQUIRED for systems over 15 kW
- Inverter-> bottom of Disconnect, top of disconnect -> top of PV Meter, bottom of PV Meter-> POI Include Utility Meter number
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility AC Disconnect
- Meter Spot Required
- 0
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Site Diagram showing the physical relationship of the significant electrical components of the Generating Facility (+ Energy Storage optional) such as modules, inverters, transformers, and control panels, the Customer's loads and the interconnections with GWP's Distribution System Diagram that must show the approximate location of all major electric components.
- Print the document labeled "GWP DERS" in the file section, with company title block and incorporate the page into PV plans.
- Include photos of MSP/equipment area and surrounding location so clearances can be seen within the planset
- SLD Reqs
Relay Meter Orientation = Over/Under
- One Line Diagram showing the electrical relationship and descriptions of the significant electrical components such as the metering equipment, panel boards, solar panels, inverter(s), AC Disconnect(s), solar meter, circuit breakers, and Energy Storage equipment (if applicable), with operating voltages, capacities, and protective functions of the Generating Facility. For GWP’s photovoltaic requirements, see MTR-DWG-009. For additional information, please contact them at .
- Existing Systems: New and existing solar must be combined into a single AC disconnect
- Install Reqs
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 1
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (855) 550-4497
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 112496
- Express Planset Eligible
- No