City of Healdsburg
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Electric Service Reqs
- All generation must be behind the property’s meters
- Work performed cannot compromise the UL or other safety ratings of the main panel or any other equipment.
- Three-phase customers must balance their load and generation equally among all phases.
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- 707.431.3346