City of Healdsburg
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
For the approval of the desired meter-location, please contact the Electric Superintendent at
- Allowed Meter Adapter
- None
Plans & docs
- Electric Service Reqs
- All generation must be behind the property’s meters
- Work performed cannot compromise the UL or other safety ratings of the main panel or any other equipment.
- Three-phase customers must balance their load and generation equally among all phases.
- Placards
See the file attachment "Labeling Requirements (PDF)"
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- 707.431.3346
Other details
- Restrict Inspection
- 0
- Address ID
- 108088
- Express Planset Eligible
- Yes