Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Roseville California

California Utility Interconnection & net metering rules
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
1
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
3
System Offset Notes

- Customer-Generators may install systems no larger than 100% of the last 12 months of energy use recorded by the electric meter.

- Residents with less than 12 months of energy use may use 3 kWh per square foot as the maximum allowed using the Developed Building square footage from the on-line Property Report. https://roseville.maps.arcgis.com/apps/webappviewer/index.html?id=2a67e5a4e1cc4f489868b6563589bf19

Offset Calc Tool
CSI

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

See Files attachment "Residential Electric Service Upgrade"

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Battery Jobs:


  • Roseville Electric requires an AC disconnect for each interconnected source.
  • The AC disconnect must be within sight of the main electric panel, within 5' of the main electric panel, and have a visible open disconnect device
  • Provide load calculations for the backup load center (and ensure all appliance/equipment with wattages are indicated)
Electric Service Reqs

SOLAR READY MPU's NOT ALLOWED PER UTILITY

Install Reqs

## SOLAR READY MPU's NOT ALLOWED PER UTILITY


Projects installed without interconnection approval are subject to being fined, and may be locked off until the required documentation is submitted and the Approval to Interconnect (Form D) is signed by Roseville Electric Utility.

Website
link
Phone
(916) 797-6937

Other details

Restrict Inspection
0
Address ID
108054
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Roseville California before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.