GMU - Gridley Municipal Utilities

California Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedYes
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.045
Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Site Plan not required for Interconnection submittal

SLD Reqs

For new construction include an electrical load estimate. Suggested methods of substantiating a load estimate include an electric load calculation with corresponding equipment schedules, building simulation program reports, or detailed engineering calculations.

Electric Service Reqs

Generating no more than 100 percent of the customer’s annual energy (kWh) usage but is less than or equal to 1,000 kW, as defined in Gridley Electric Utility’s standards for interconnection, and Operating parallel with the City’s electric utility system, and designed to offset part of, but no more than 100 percent of, the customer’s meter of record total annual kilowatt-hour electric load


Per Gridley, Load Side Taps are Required

Install Reqs

Systems in excess of 10kW may be subject to a system impact study at the discretion of the Gridley Electric Utility.

Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(530) 846-5695

Other details

Revision Required
No
Mod Swap Requires Planset
No