LEU - Lodi Electric Utility

California Utility Interconnection & net metering rules
Net Metering Allowed0
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes

Any unused excess solar generation is sold back to Lodi Electric at the posted EP credit rate. Any energy provided to you from the Lodi Electric grid is charged at the current retail rate.

Rebates Offered
1
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes


Offset Calc Tool
CSI

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Generation Meter
AC Disconnect Required
Yes
Meter Spot Required
1
Meter Spot Process
  • Complete the Service and Meter Application Load/Photovoltaic Information Sheet and submit it with your building permit request.
  • Note: A separate permit is required to change out/upgrade an electrical service panel. If work is being done to a main-panel or if the Utility disconnects power, a signed final-inspection of the main-panel from the Building Department is required before the Utility will reconnect power.
  • If you have any questions regarding this form please contact them at . Information about LEU and its policies and regulations can be found on our website at www.lodielectric.com
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs


SLD Reqs
  • AC Disconnect cannot be more than 10ft away from meter, and must be accessible at all times. If it is behind a fence/gate, it cannot be locked.

Include these notes on ELD:

  • Arrow to Disco: ELECTRIC UTILITY DEPARTMENT TO HAVE CONTINUOUS ACCESS TO LOCKABLE DISCONNECT AT ALL TIMES. AC DISCONNECT MUST BE WITHIN 10' (MAX) FROM MAIN SERVICE PANEL AND NOT BEHIND LOCKED GATE. (EES 942 0240)
  • Arrow to Disco: AC DISCONNECT SHALL BE LOCK OUT/TAG OUT CAPABLE, SINGLE THROW, DOUBLE POLE AND FUSED. (EES 942 0240)
  • Arrow to POI: THE SUM OF THE MAIN CIRCUIT BREAKER AND PV SYSTEM CIRCUIT BREAKER SHALL NOT BE GREATER THAN 120% OF THE MAIN SERVICE PANEL RATING, PER CALIFORNIA ELECTRIC CODE. (CEC 690.64)
  • Arrow to Generation Meter: GENERATION METER SOCKET SUPPLIED BY CONTRACTOR. GENERATION METER SUPPLIED BY CITY OF LODI, ELECTRIC UTILITY DEPARTMENT.
  • Add in LLH corner: ALL PV SYSTEM SIGNAGE SHALL BE INSTALLED AND LOCATED PER EES 942 0240.

Existing Systems

  • only one production meter per address
Equipment Approvals
California Energy Commission
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
209-333-6762

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
108037
Express Planset Eligible
No