Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Lamar Light and Power

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Net credits shall be defined as the difference between customer generated energy and Board supplied energy under circumstances where the customer generation equipment supplies more than the energy needs (kWh) consumed by the customer generator. Net credits will be carried over from month to month for a period of twelve months beginning April 1 and ending on March 31, the "Net Metering Period". A reconciliation of the account will be performed on March 31. If a credit balance remains at the end of the Net Metering period, within sixty (60) days of the end of the Net Metering Period a payment will be made or, at the option of the customer, the credit will be carried forward to the next Net Metering Period. Bills shall be calculated and rendered on a monthly billing cycle basis. If paid out after the "Net Metering Period", it'll be calculated as remaining kWh multiplied by the avoided cost.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

10 kW AC

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

PV Meter Socket shall have 5 Terminals with Lever Bypass. Show this on plans

Electric Service Reqs

All Utility Meter housings to be upgraded to a 200A 5-terminal Lever Bypass meter housing.

Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(719) 336-7456

Other details

Restrict Inspection
0
Mod Swap Requires Planset
1
Address ID
175737
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Lamar Light and Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.