Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

LPEA - La Plata Electric Association, Inc.

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If your solar PV system produces more energy than you use in a month, the excess kilowatt-hours (kWh) are credited to your Net Meter Bank. Credit stored in the Net Meter Bank can be used for the following month. During the April billing period of each year, the Association shall pay a credit for excess generation to the customer-generator equal to the avoided cost.


LPEA’s current general services energy rate per kWh covers not only energy expenses, but also expenses associated with poles, wires, and other system related items that are still largely needed by net metered services. It is possible that LPEA’s rate structure could change in the future resulting in separate charges for energy and system expenses.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
1
Tap Criteria


Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
150
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Up to 25 kW DC OR 150% offset (whichever is LESS)

Insurance requirement will go up for over 10 kW DC

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs


SLD Reqs

The AC Disconnect on the one-line diagram needs to be labeled "LPEA Accessible AC Disconnect"

Electric Service Reqs


Install Reqs

Inverter settings must be set accurately. A screenshot of the "Status" page that shows the following must be uploaded as it's required for IX PTO Submission .

For SolarEdge Country & GridUS/Rule21 240V

For Enphase Grid ProfileCO LPEA 201906 VV, VW


 Please ensure that after commissioning that the required photos will be uploaded:

Placards

Have a clearly displayed permanent and weather proof sign indicating the location of the Generation Disconnect. 

AC DISCONNECT : visibly marked "Generation Disconnect"

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(970) 382-3504

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
183049
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with LPEA - La Plata Electric Association, Inc. before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.