LWP - Loveland Water and Power
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The City will net meter all energy consumed by the customer and produced by the customer’s generation system. Net metering shall be, for billing purposes, the net consumption as measured at the service meter on a monthly basis. All excess energy generated, expressed in kilowatt-hours, shall be carried forward from month to month and credited against the customer’s energy consumption, expressed in kilowatt-hours, in subsequent months. In the event that a negative net consumption balance remains at the time of the customer’s December billing, the City will pay the customer for such negative balances at the Self-Generation Buyback Credit for December Billing Only Rate.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Size of system cannot exceed 120% of previous year’s usage. If no history exists, then proper sizing justification must be provided with calculations shown
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Site Plan should include the following:
- Disconnect switch called out as "Utility Disconnect (Lever Bypass)", manual, with visible open, within 10 ft of UM
- Service entrance (specify overhead or underground)
- Setbacks
- Grounding electrodes
- Distance between equipment and property lines
Labels indicating "High Voltage Danger" and "Emergency Shut-Off" must be located at the meter and on the PV system.
Equipment Elevation Drawing --------------------
Provide drawing of BOS wall including service entrance, meter equipment, PV AC disconnect, PV inverters/combiner boxes, and all other added equipment. Show horizontal and vertical clearances. See "Eqpt Elevation Drawing" in Files section of this page.
- SLD Reqs
Line side taps are not allowed.
Show whether the system is stand-alone, grid-tied or hybrid.
Specify conductor insulation types (THHN, THWN, direct burial cable, etc.)
Specify conductor material types (copper, aluminum, etc.)
Specify conduit materials (non-metallic, EMT, etc.)
Specify overcurrent device ratings.
Specify amperage ratings of all load centers, new and existing.
Specify buss ratings of all load centers, new and existing.
Specify if modules and arrays are connected in series or parallel.
Provide structural calcs for Roof Mount installations.
For Flat Roof installations, specify roof penetration repair method.
Provide the following for Pole or Ground Mount installations:
- Site Plan Review Waiver approval (as of January 1, 2011)
- Distance between equipment and property lines and property easements
- Distance between panel(s) and other structures on the property
- Colorado licensed design professional footing design
- Electric Service Reqs
If we are not upsizing amperage, the conversion from overhead to underground is not required.
- Install Reqs
Utility Disconnect must be manual, with visible open, within 10 ft of UM.
In most cases, service entrance conductors must be underground and in conduit.
- Website
- link
- Phone
- (970) 962-3000
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 164512
- Express Planset Eligible
- Yes