MCREA - Morgan County REA
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- Residential (up to 10 kW) Inverter Generation Facility and Commercial (10 - 25 kW) Inverter Generation Facility. Any renewable energy system interconnection application in excess of 10 kW for residential purposes must be approved by the Morgan County Rural Electric Association Board of Directors.
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility AC Disconnect
- Meter Spot Process
- Morgan REA requires an approval sticker from the county in order to set a meter.
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- DORA Inspector requires the available fault current at the transformer
- Electric Service Reqs
- Install Reqs
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- 970.867.5688
Other details
- Restrict Inspection
- 0
- Address ID
- 108079
- Express Planset Eligible
- No