PVREA - Poudre Valley REA

Colorado Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
Yes
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Net monthly sales of electric energy delivered to the C-G shall be at the Association’s standard monthly rate including any Facilities Charge or minimum as applicable to the customer class. In the event the net monthly electric energy produced by the C-G and delivered back onto the Association’s system exceeds the monthly electric energy delivered to the C-G by the Association, such excess electric energy delivered to the Association shall be carried forward as an electric energy credit for the following month. However, in no event shall the C-G’s monthly electric bill be less than the greater of the consumer’s monthly minimum or the monthly Facilities Charge. Within sixty days after the end of each annual period, defined as April 1 through March 31, or within sixty days after the Consumer terminates retail service, the Association shall pay the Consumer for any remaining unused energy credit balance accumulated. The rate for payment shall be the Association’s most recent avoided cost of power. The avoided cost of power shall be calculated annually for the twelve-month period ending December 31. The current avoided cost is published on the Association’s website.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Tap Criteria
  • Line and Load side taps are allowed using any service rated UL listed taps. (polaris lugs, Btaps, etc.)
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Combination
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

PVREA AC Disconnect Requirements

  1. Must have a visible knife blade
  2. Must be non-fusible
  3. Must be lockable
  4. Must be accessible to the utility (not behind locked gates)
  5. Must be within 5 feet of the utility meter. Exceptions require PVREA approval may delay the project. Indicate the disconnect’s location relative to the utility meter (e.g., “within 5 ft of meter” or “on south side of garage”).
SLD Reqs

All Projects

  • Show a visible knife-blade type, non-fusible, lockable AC disconnect on the line diagram.
  • For AC Disconnect placard and labeling requirements, reference the Placards field.

MPU Projects

  • Show a minimum Type 2 SPD on the diagram.
Electric Service Reqs

NEC 2020 Compliance

  • Per Section 230.67, all new or replaced electrical equipment must have a Type 1 or Type 2 surge-protective device (SPD).
  • Reference: “Surge Protection and NEC 2020” in the Files section.

MPU Projects

  • If the project includes an MPU, a minimum Type 2 SPD must be installed.
Install Reqs


Placards

AC Disconnect Placards

Disconnect near meter (within 5 feet)

  • Mount a placard directly on the AC disconnect cover
  • Text must read: “Generator AC Disconnect” (or similar)
  • Placard must be easy to see for PVREA personnel

Disconnect more than 5 feet from meter

  • 1. One on the AC disconnect → “Generator AC Disconnect”
  • 2. One on the main service breaker cabinet (below the meter) → must show the location of the “Generator AC Disconnect.”
  • A site plan placard is also required showing disconnect location.
Electrical Stamp Required
No
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(800) 432-1012

Other details

Revision Required
Yes
Mod Swap Requires Planset