SLVREC - San Luis Valley Rural Electric Cooperative
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
120% of the previous 12 months electric energy consumption up to 25kW.
- Offset Calc Tool
- N/A
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Production Meter required.
- Inverter > Disco > PV Meter > POI
- Install Reqs
DG facilities require two meters in accordance with the Net Meter Distributed Generation Guideline. A $100 meter fee is also required for each DG facility. DC Facilities must be installed "behind the meter" on a new or existing electric service supplied by the Cooperative.
- Website
- link
- Phone
- (719) 852-3538