SLVREC - San Luis Valley Rural Electric Cooperative

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

120% of the previous 12 months electric energy consumption up to 25kW.

Offset Calc Tool
N/A

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

SLD Reqs
  • Production Meter required.
  • Inverter > Disco > PV Meter > POI
Install Reqs

DG facilities require two meters in accordance with the Net Meter Distributed Generation Guideline. A $100 meter fee is also required for each DG facility. DC Facilities must be installed "behind the meter" on a new or existing electric service supplied by the Cooperative. 

Website
link
Phone
(719) 852-3538

Other details

Restrict Inspection
0
Address ID
136331
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with SLVREC - San Luis Valley Rural Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.