Town of Estes Park

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredNo

Net metering & export

Net Metering Allowed
1
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
No
AC Disconnect Labeling
N/A
Meter Spot Process

Disconnect/Reconnect Process

  1. Request a work order from the utility before scheduling a utility disconnect.
  2. Ensure the work order is completed by both the utility and .
  3. Receive the completed work order by email.
  4. Submit the disconnect/re-connect payment.
  5. Follow the email instructions to schedule the utility disconnect.
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Electric Service Reqs


Install Reqs


Electrical Stamp Required
0
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(970) 577-3625

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
108087
Express Planset Eligible
Yes