Town of Oak Creek

Colorado Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

At the end of the billing period, the Town will subtract the metered energy that was delivered to the Town’s Electric System from the metered energy which was supplied by the Town. The net positive energy supplied by the customer will be billed at the applicable retail rate. A net positive energy deliver to the Town’s Electric System will be carried forward as a kWh credit to the customer. Any credit balance remaining on May 31st of each year or upon termination of electric service will be settled and paid to the customer within sixty (60) days. Other applicable fees and charges, including the base rate and demand charge of the retail rate, will be billed to the customer.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Can be sized up to 25 kW

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link

Other details

Revision Required
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Town of Oak Creek before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.