Bozrah Light & Power
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- General site plan of the proposed installation
- SLD Reqs
- A one-line electrical schematic drawing(s) depicting the completeproposed system design. The drawing(s) must show all electricalcomponents and protective relaying proposed for the installation.
- Install Reqs
- Category 1 and 2 Installations: The electric service shall bemetered for revenue purposes primarily using two watt-hourmeters with detents or, if feasible, one two-channel, electronic,solid state meter that is capable of measuring bi-directional powerflow.
- Website
- link
- Phone
- (860) 886-9016
Other details
- Restrict Inspection
- 0
- Address ID
- 135777
- Express Planset Eligible
- Yes