NPU - Norwich Public Utilities
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- No
- NEM Type
- N/A
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Net Excess Generation Notes
NPU does not offer net metering and any credit from NPU will be at a lower rate than what is delivered from NPU. Excess generation will be reimbursed on a monthly basis (via bill credits) based on the CT ISO avoided costs, adjusted for system loss.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Tap Criteria
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Utility meter, production meter, and AC disconnect must be located outside.
- Include spec sheets for panel, inverter, battery (if applicable), and production meter in planset
- SLD Reqs
Meter Orientation = Over/Under
- Production meter should be wired with the top toward the inverter
- Please
- Install Reqs
- All solar installations require a witness test. There is no cost, and the scheduling is based on the availability of those involved (customer, solar contractor, our engineer and field service tech, building department). The appointment is scheduled for 1.5 hours.
- Electrical Stamp Required
- No
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (860) 887-2555
Other details
- Revision Required
- No
- Mod Swap Requires Planset
- Yes