Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 110
- Offset Calculation Basis
- Average
- Offset Calculation Period
- 24
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The City allows you to build 110% of the customer’s 2 year historical usage. There is a system size cap of 25kW for Residential, 500kW for Commercial, and 100kW for Farm.
The maximum size of the system is based on the 2 years of historical usage data. In order for us to provide you with that information this release form needs to be filled out and sent back to a past project :
https://www.cityofdover.com/media/Electric Department/COD Release Form.pdf
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
The City will supply and install a bi-directional meter free of charge in place of the customer’s old meter. The contractor is required to request a Disconnect Power for the home by calling 736-7072 in order to land conduit and wires into the existing meter box. After we receive inspection certificates and Part II of the application we will create a w/o for our meter to be installed.
Some solar companies will place their own meter for their own metering purposes but we do not require such a meter.
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
- Phone
- (302) 736-7070
Other details
- Restrict Inspection
- 0
- Address ID
- 216493
- Express Planset Eligible
- Yes