Lewes BPW

Delaware Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Solar Export Rate
0.11
Net Excess Generation Notes

The credits roll over every month and at the end of the fiscal year(April 1-March31) if a customer has KWH credits(excess), then it will be reimbursed at the Supply Service Rate which is calculated annually based off power supply cost factors.

There is no rate schedule for Net Metering. Our electric rates are located on our website. Solar Credits roll from month to month and at the end of the year, if the customer has excess credits, they are reimbursed at the current Supply Service Rate.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
1
Offset Type
Combination
Offset Value
110
Offset Calculation Basis
Average
Offset Calculation Period
24
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes


Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(302) 645-6228

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
211349
Express Planset Eligible
Yes