Delaware Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Customers to be credited in kilowatt-hours (kWh), for any excess production of their generating facility that exceeds the customer’s on-site consumption of kWh in a billing period (an “Excess kWh Credit”). Excess kWh Credits shall be credited to subsequent monthly billing periods to offset a customer’s consumption in those billing periods. Excess kWh Credits at the end of the annualized billing period shall revert to the electric distribution company providing electric distribution to the customer. Annual billing is April of the first year up to March of the following year, this is to offset the winter months when solar produce less.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
110
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Up to 110% of historic 2 years of energy consumption. Max 25kW.

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Visible, lockable AC disconnect.

SLD Reqs

Visible, lockable AC disconnect.

Website
link
Phone
(302) 378-2211

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
211339
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Town of Middletown before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.