CHELCO - Choctawhatchee Electric Cooperative
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
The customer’s bill will be calculated by subtracting the credit to the customer from the Cooperative’s charges to the customer. If the credit to the customer is greater than the Cooperative’s charges to the customer, the customer’s bill shall be zero for the current billing cycle with the difference credited to the customer in subsequent billing cycles. When the customer discontinues Net Metering Rate service, any unused credit will revert to the Cooperative.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Install Reqs
CHELCO inspection of generation system is required prior to completing interconnection. Without a properly programmed meter, energy intended as sold to CHELCO will appear on member’s billing as energy usage, billed to a member with no way of separating used and sold energy.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (850) 892-2111
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 0
- Address ID
- 108136
- Express Planset Eligible
- Yes