City of Leesburg Electric Department

Florida Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.05
Solar Export Value Notes
$ 0.05 per kWh as of 2022 https://www.leesburgflorida.gov/services/electric/solar.php
Net Excess Generation Notes

Excess customer-owned renewable generation shall be delivered to the Utility’s electric distribution system. For purposes of this Agreement, the term “excess customer-owned renewable generation” means any kWh of electrical energy produced by the customer-owned renewable generation system that is not consumed by Customer and is delivered to Utility’s electric distribution system. FMPA agrees to purchase and receive, and Customer agrees to sell and deliver, all excess customer-owned renewable generation at the energy rate established by FMPA, which shall be calculated in accordance with Appendix B. Excess customer-owned renewable generation shall be purchased in the form of a credit on Customer’s monthly energy consumption bill from Utility.

In the event that a given monthly credit for excess customer-owned renewable generation exceeds the total billed amount for Customer’s consumption in any corresponding month, then the excess credit shall be applied to the subsequent month’s bill. Excess energy credits produced pursuant to the preceding sentence shall accumulate and be used to offset Customer’s energy consumption bill for a period of not more than twelve (12) months.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Meter Orientation = Over/Under

Production Meter Required.

Show The production meter must be in the one-line EXACTLY as the diagram (

The feed-in from the solar must come in the top, and the feed out to the panel must go out the bottom.

Electrical Stamp Required
No
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Site Plan Notes

We can only have one solar production meter per home

Website
link
Phone
(352) 728-9786

Other details

Revision Required
No
Mod Swap Requires Planset
Yes