City of Quincy Utilities

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes
  • Electric energy from the customer-owned renewable generation system we shall first be used to serve the Customer’s own load and offset the Customer’s demand for the City of Quincy electricity. Any kWh of electric energy produced by the customer-owned renewable generation system that is not consumed by the Customer’s own load and is delivered to the City of Quincy system shall be deemed as “excess customer-owned renewable generation.”
  • Excess customer-owned renewable generation shall be purchased by the City of Quincy in the form of a credit on the Customer’s monthly energy consumption bill. Each billing cycle, Customer shall be credited for the total amount of excess energy generated by the customer owned renewable generation that is delivered to the City of Quincy’s electric system during the previous billing cycle. The credit from the City of Quincy shall be determined at a rate equal to the City of Quincy’s wholesale avoided cost.
  • If a given credit for excess customer-owned renewable generation exceeds the total billed amount for Customer’s consumption in any corresponding billing period, then the excess credit shall be applied to the Customer’s subsequent bill. Excess energy credits produced pursuant to the preceding sentence shall accumulate and be used to offset Customer’s energy consumption bill for a period of not more than twelve (12) months. In the last billing cycle of each calendar year, any unused excess energy credits shall be paid by the City of Quincy to the Customer, at the City of Quincy’s wholesale avoided cost rate.
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes
  • Max System Size: 100 kW GPR (GPR = DC Size * 0.85) or 100% offset
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes

Plans & docs

Site Plan Reqs
  • AC Disconnect is required to be accessible to the utility 24/7
SLD Reqs
  • AC Disconnect required
Website
link
Phone
(850) 618-0020

Other details

Restrict Inspection
0
Address ID
1221297
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Quincy Utilities before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.